-40%
Bolster D Wagon - Cambrian C114
$ 11.88
- Description
- Size Guide
Description
Bolster D Wagon- OO unpainted plastic kit
Require glue, paint, transfers, couplings, wheels (
Gibson 12mm 3-hole
& brass bearings) to complete.
BR Bolster D built to D1/478 with roller bearing plate bogies, and handwheels for manual braking. 200 of these wagons were built at Lancing in 1959-60. About 15 of these wagons were "converted" in the mid-60s to carry coils from Corby and possibly other steel mills. This was only a minor alteration using timber to position the coils. Later, a number (7+) were used for overhead electrification work, with "DofM&EE. BRB. HQ. ELECTRIFICATION" in large lettering along the sides. These were air-piped and had the TOPS code YYW.
Alan Gibson Wheels compatible : 12mm 3-hole
Easy to assemble and fun to paint.
Buy with confidence as this listing is linked to our
model shop on the Isle of Wight.
Bolster D Wagon - OO unpainted plastic kit Require glue, paint, transfers, couplings, wheels (Gibson 12mm 3-hole & brass bearings) to complete. BR Bolster D built to D1/478 with roller bearing plate bogies, and handwheels for manual braking. 200 of these wagons were built at Lancing in 1959-60. About 15 of these wagons were "converted" in the mid-60s to carry coils from Corby and possibly other steel mills. This was only a minor alteration using timber to position the coils. Later, a number (7+) were used for overhead electrification work, with "DofM&EE. BRB. HQ. ELECTRIFICATION" in large lettering along the sides. These were air-piped and had the TOPS code YYW. Alan Gibson Wheels compatible : 12mm 3-hole Buy with confidence as this listing is linked to our model shop on the Isle of Wig